[1] Minjing Ning, Zhengwen He, Nengmin Wang, Renjing Liu. Metaheuristic Algorithms for Proactive and Reactive
Project Scheduling to Minimize Contractor’s Cash Flow Gap under Random Activity Duration [J]. IEEE Access, accepted.
(DOI: 10.1109/ACCESS.2018.2828037, IF:3.244).
[2] Minjing Ning, Zhengwen He, Tao Jia, Nengmin Wang. Metaheuristics for multi-mode cash flow balanced project
scheduling with stochastic duration of activities[J]. Automation in Construction, 2017, 81, 224-233.
(DOI: https://doi.org/10.1016/j.autcon.2017.06.011, IF:2.919)
[3] 何正文,寧敏靜,徐渝.前攝性及反應(yīng)性項目調(diào)度方法研究綜述.運籌與管理,2016,25(5),278-287.
[4] 寧敏靜,何正文,劉人境.基于魯棒性約束的隨機活動工期現(xiàn)金流均衡項目調(diào)度優(yōu)化.系統(tǒng)工程,2015,33(9),91-100.
[5] 寧敏靜,何正文,劉人境.基于隨機活動工期的多模式現(xiàn)金流均衡項目調(diào)度優(yōu)化,運籌與管理.(已錄用)
論文題目:隨機活動工期下現(xiàn)金流均衡項目調(diào)度優(yōu)化